Six Sigma (often written 6 Sigma) is a data-driven method for reducing defects and variation in a process. Lean is a method for removing waste, and Lean Six Sigma combines the two. A Lean Six Sigma Black Belt is the practitioner who leads improvement projects and coaches Green Belts. BOTI runs Yellow, Green and Black Belt training as part of its project management, agile and process improvement courses.
See all BOTI corporate training courses.
If you are learning about project management and want to streamline business processes, read on. This article introduces three significant methodologies: Lean, Six Sigma and Lean Six Sigma. You do not need any prior experience with these concepts to follow it.
Lean Methodology
What exactly is Lean?
The Lean methodology is a systematic approach to reducing or eliminating tasks and activities in a process that do not add value. The emphasis is on removing wasteful steps and keeping only the steps that add value. Lean is geared towards high quality and customer satisfaction, and it helps to:
- Reduce process cycle time
- Improve service or product delivery time
- Eliminate or reduce the chances of defect generation
- Reduce inventory levels
- Make improvements to the overall process by optimising resources
Lean is a continuous approach to removing waste, so it produces an ongoing chain of improvements.
What is ‘value’ with respect to Lean Methodology?
In many processes, a large share of the activities do not add value from the customer’s point of view. The goal of the Lean methodology is to improve process efficiency. It does this by identifying these non-value-adding activities and using Lean tools to reduce or eliminate them.
It is also important to define what ‘value’ means in Lean. The meaning depends on the industry and the type of business process. In general, value is defined by what the customer is prepared to pay for in a product or service.
A ‘process’ is a set of activities that use resources to convert inputs into outputs. These activities can be classified as follows:
- Non-value-added activities
Non-value-added activities are the wasteful steps in the process. They do not add value to the final product.
- Value-added-activities
Value-added activities are essential to the process and improve it in terms of quality and productivity.
- Enabling value-added-activities
Enabling value-added activities do not add value for the customer, but they are still essential to the process.
The different types of waste and waste removal
The Lean methodology has its origins in the Toyota Production System (TPS). TPS was designed for high-volume production, but Lean can be applied in any environment where process waste occurs, in manufacturing and in service industries alike. Lean reduces waste step by step. It uses the 3M model (Muda, Mura, Muri) to reveal the inefficiencies that get in the way of generating customer value. Let us look at the 3M model in more detail:
- Muda
Muda refers to activities that do not add value for the customer in the creation of the product or service. Seven types of Lean waste were first identified in manufacturing processes, and an 8th waste was added later. Removing these wastes is seen as the key to delivering value to the customer.
The 8 wastes under the Lean Process
Overproduction: This refers to producing earlier, faster or in higher quantities than customers demand.
Inventory: This refers to keeping raw materials, work in progress or finished items that do not add value.
Waiting: This refers to people or parts waiting for a cycle to be completed.
Motion: This refers to the unnecessary movement of people, parts or machines within a process.
Transportation: This refers to the unnecessary movement of parts or people between processes.
Rework: This refers to not getting it right the first time: repeating a process, or correcting or modifying its output.
Over Processing: This refers to processing beyond the standard that customers require.
Underutilisation of skills: This refers to inadequate and ineffective use of people’s skills.
- Mura
Mura is unevenness: the variations in business operations that lead to production inconsistencies. These deviations leave resources underused at some times and overloaded at others. Accumulated inventory, uneven workloads and waiting are examples of Mura. Wherever Mura exists in a process, Muda follows.
- Muri
Muri is overburden: too much stress and strain placed on people and machines. Examples are office staff working excessively long hours and building up overtime, and machinery overused in manufacturing plants. Even when outcomes are still achieved, Muri leads to dissatisfaction among staff or to machine downtime. Muri also leads to Muda.
Removing the 8 types of waste using Lean Methodology
The 3M model uses Muda, Mura and Muri to pinpoint the inefficiencies that hamper customer value. Another way to remember the wastes uses the acronym ‘DOWNTIME’:
| Waste | Waste Definition |
| Defects | The time and effort involved in searching for and rectifying errors, and new errors that emerge during rework. |
| Overproduction | Producing more products or services than customers require or than the downstream process can use. |
| Waiting | Idle time because inputs such as materials, information, people or equipment are not ready on time. This can include long job set-up times in manufacturing or disproportionately long data processing times in services. |
| Non-utilised Talent | Employee skills and creativity not being used effectively. Involving employees in improvement work can counter this waste. |
| Transportation | Products, equipment, information, materials or people being moved from one place to another without adding any value to the final product or service. |
| Inventory | Unnecessary or unwanted stock, or unnecessary storage of information and/or materials. |
| Motion | Unnecessary movement of people within a workspace, such as walking, reaching or searching for tools and files. |
| Extra-processing | Doing more work, or adding more features or checks, than the customer needs or will pay for. |

The Principles of Lean
Lean principles can be applied to any process to reduce waste. There are 5 Lean principles:
- Defining Value
The customer determines the value of a product or service, so the first task is to identify your customers. Ask questions such as: what does the customer value, and what does the customer expect? Then sort the process activities into non-value-added, value-added and enabling value-added activities.
- Mapping the Value Stream
Mapping the value stream shows every step in the workflow. This helps you identify and remove non-value-added activities and tasks.
- Creating Flow
Creating flow is a key concept in Lean, because waiting in any form is waste. The goal is smooth delivery from the moment an order is received until the customer takes delivery.
- Establishing Pull
A pull approach lets the process keep pace with the system’s beat time, usually called takt time. Takt time is the rate at which a product must be completed to meet customer demand. Just-in-time (JIT) is an inventory management approach that supports the pull system: goods are received from suppliers only as and when they are needed. This reduces inventory holding costs and increases inventory turnover.
- Seeking continuous improvement
Seeking continuous improvement means making consistent efforts to improve existing processes. The aim is to meet customers’ changing needs while removing waste and defects.
Important tools used in the Lean process
- VSM (Value Stream Mapping)
As mentioned above, value stream mapping helps you identify process wastes and see how they occur.
- Kaizen
Kaizen is a continuous improvement method that focuses on small, frequent improvements to a process. It works best when the people who do the work suggest and make the improvements, with first-line managers committed to the process and senior management supporting it. BOTI’s Kaizen Training Course – Continuous Improvement covers the method in practice.
- 5S
5S is a workplace organisation method with five steps: sort, set in order, shine, standardise and sustain. It makes waste visible and reduces motion and waiting. See BOTI’s 5S Training Course – Workplace Organisation.
- Just in Time (JIT)
As mentioned above, Just in Time (JIT) is a pull approach. Materials and products are delivered only as and when they are required.
- SMED (Single-Minute Exchange of Die)
SMED (Single-Minute Exchange of Die) is a system for sharply reducing the time it takes to complete equipment changeovers. The idea is to move as many changeover steps as possible to ‘external’ steps, done while the equipment is still running, and then to streamline and shorten the remaining steps.
- Poka-Yoke
Poka-yoke is a Japanese term that translates as ‘mistake-proofing’ or ‘inadvertent error prevention’. A poka-yoke is any device or mechanism in a process that helps an operator avoid mistakes and defects. It works by preventing, correcting or highlighting human errors as they arise.
- Jidoka (Autonomation)
Jidoka is a Japanese term usually translated as ‘autonomation’, a combination of ‘autonomous’ and ‘automation’. It is often described as automation with a human touch. In Lean, it means machines stop automatically when they detect an abnormal condition. Operators then fix the problem and its cause to prevent it from recurring.
- Heijunka
Heijunka is the approach used to reduce unevenness in a production process. It is also referred to as production levelling or line balancing, and the aim is to spread the production load evenly across production lines.
- Gemba
Gemba is another Japanese term, and it literally translates as ‘the actual place’. Going to the gemba means visiting the front line to look for evidence of waste and areas that need improvement. The gemba walk is similar to management by walking around (MBWA).
- Kanban
Kanban is a Japanese term that translates as ‘signboard’ or ‘visual card’. It is a visual system for tracking and managing work as it moves through a process, and it is useful for managing inventory levels. Kanban boards show current work or inventory levels in real time and alert management when levels become excessive. BOTI’s Kanban Essentials Certified (KEC) Training applies the method to teams and workflows.

Six Sigma Methodology
What exactly is Six Sigma?
Six Sigma is a data-driven problem-solving methodology that focuses on variation in a process. It is centred on customer satisfaction. Its aim is a continuous improvement process that reduces or eliminates as many defects as possible.
The Aim of Six Sigma
A process operating at Six Sigma produces no more than 3.4 defects per million opportunities. That is about 99.99966% defect-free, a figure sometimes shortened to 99.9996%.
Six Sigma projects follow the DMAIC framework, which has 5 distinct phases:
- Define
- Measure
- Analyse
- Improve
- Control
The 5 phases of the DMAIC Framework in Detail
- Define
In this phase, the aims and objectives of the project are set out and the project charter is drawn up. The project charter is the critical output of this phase and acts as the blueprint for the Six Sigma project.
- Measure
In this phase, the team measures the key variables, collects process data and establishes a baseline. The baseline is later compared with performance after the improvements.
- Analyse
In this phase, the team finds the root causes of the problem. Tools such as Pareto charts, histograms and fishbone diagrams help identify the root causes of a defect. Hypothesis tests such as ANOVA, regression and chi-square tests are then used to confirm those root causes.
- Improve
The Improve phase starts once the root causes have been confirmed. The team develops solutions that remove those causes. Tools such as design of experiments, prototyping and simulation studies are used to improve process performance.
- Control
Once the solutions are in place, their effectiveness must be recorded and a control system set up to monitor performance. A response plan is also drawn up in case a solution fails. Control charts show how the process is performing, and the actual project benefits are checked against the estimated benefits.

Lean Six Sigma Methodology
What exactly is Lean Six Sigma?
One widely used definition puts it this way:
“Lean Six Sigma is a fact-based, data-driven philosophy of improvement that values defect prevention over defect detection. It drives customer satisfaction and bottom-line results by reducing variation, waste, and cycle time while promoting the use of work standardization and flow, thereby creating a competitive advantage. It applies anywhere variation and waste exist, and every employee should be involved.”
In short, Lean Six Sigma combines the two approaches: Lean principles reduce or eliminate process waste, and Six Sigma reduces variation within the process. Note the emphasis on prevention. It is better to prevent a defect than to detect and correct it afterwards. For a practical view of how this applies in a business, read business optimisation through Lean Six Sigma.
The key Elements of Lean Six Sigma
There are three key elements of Lean Six Sigma:
- Customers
The old saying ‘the proof of the pudding is in the eating’ applies here. The moment of truth for the customer is the experience of the product or service. Customers today have more information and more choices than ever before. They also expect more for less and want support throughout their experience with the product. This calls for an approach that looks at business processes from the outside in, which is central to Six Sigma.
- Processes
An outside-in approach requires the business process value chain to be defined. To deliver the right quality within the expected time, Lean Six Sigma helps organisations focus on producing consistent, quality outputs and improving the value chain.
- Employees
Lean Six Sigma works fully only when it is part of how the organisation operates every day. Employee buy-in is therefore critical, and people at all levels of the organisation need to be working towards the same goals.
The relevance of Lean Six Sigma in Today’s world
Business conditions change constantly, and on its own neither Lean nor Six Sigma can address every improvement scenario. When the two work together, Lean first removes the waste and Six Sigma then reduces process variation. Combined, they help organisations build streamlined processes that deliver consistent quality.
Lean Six Sigma Belts
In Lean Six Sigma (LSS), belt levels show a person’s depth of knowledge and the level of project responsibility they take on:
- Master Black Belt (MBB): An expert in the Six Sigma methodology and statistical tools. The MBB provides Six Sigma guidance and technical leadership for a function or department in an organisation. Coaching, mentoring and training Black Belts also fall within the MBB’s role, and MBBs often sign off Black Belt projects.
- Black Belt (BB): Usually a full-time professional who leads Six Sigma projects. Black Belts are experts in the methods and tools of Lean Six Sigma, and they coach Green Belts and give them Six Sigma expertise.
- Green Belt (GB): Usually works on improvement projects alongside a functional or leadership role. Green Belts drive operational excellence in their teams or functions. They apply Lean Six Sigma techniques to real process problems and, under the guidance of Black Belts, manage projects from concept to completion.
- Yellow Belt (YB): Has a basic knowledge of Lean Six Sigma. Yellow Belts usually support a Green Belt or Black Belt project as a core team member or subject matter expert.
BOTI runs Lean Six Sigma Yellow Belt Training (4 days), Lean Six Sigma Green Belt Training (6 days) and Black Belt training (10 days). For a shorter introduction, there is Lean Process and Six Sigma Training (2 days).

Frequently asked questions
What is 6 Sigma?
Six Sigma, often written 6 Sigma, is a data-driven problem-solving method that reduces variation and defects in a process. Projects follow the DMAIC framework: Define, Measure, Analyse, Improve and Control.
What does 99.9996% mean in Six Sigma?
A process at Six Sigma produces no more than 3.4 defects per million opportunities. That is about 99.99966% defect-free, which is often shortened to 99.9996%.
What is the difference between Lean and Six Sigma?
Lean focuses on removing waste, such as waiting, overproduction and rework, so that work flows. Six Sigma focuses on reducing variation so that the output is consistent. Lean Six Sigma uses both, usually removing waste first and then reducing variation.
What does a Lean Six Sigma Black Belt do?
A Black Belt leads Lean Six Sigma improvement projects, applies the statistical tools in the DMAIC phases and coaches Green Belts. Black Belts usually work on improvement projects full time.
Does BOTI run Lean Six Sigma Black Belt training?
Yes. BOTI runs a 10-day Lean Six Sigma Black Belt course, as well as Yellow Belt and Green Belt courses. If you need a specific external certification, check that body’s own requirements before you book.
If you want someone to lead improvement projects and apply DMAIC in your organisation, look at BOTI’s Lean Six Sigma Black Belt Training. Training runs in-house at your premises, at BOTI’s venue in Sunningdale, Johannesburg, or live online. Call BOTI on 011 882 8853 or email [email protected], or request a quote. This course is not accredited. It is delivered as a professional skills programme, and delegates receive a BOTI certificate of attendance.




